2021 BBJ Building Birmingham Award Winners
KMS and The Historic Greyhound Station were announced as winners of the 2021 Birmingham Business Journal Building Birmingham Awards.
KMS (Kemp Management Solutions)
Winner of 2021 Building Birmingham Awards
Birmingham’s Lakeview District has gained new life with the renovation of an existing warehouse space along the Second Avenue South Pepper Place corridor. The vision for this 12,000sf corporate headquarters to maintain the spirit and bones of this old masonry warehouse was achieved through a series of modern adaptations to special building features such as the existing mezzanine supported from the roof deck above, and reuse of the generous amount of skylights.
The design for this family-owned business creates a professional home away from home. The setting combines professionalism and seriousness with that of a relaxed, comfortable family atmosphere for employees to gather, meet with clients, and provide focused work zones in several environments away from their desk.
Historic Greyhound Station
Winner of 2021 Building Birmingham Awards
The Historic Greyhound Bus Depot (1952) is located in the heart of the Birmingham Central Business District near Linn Park and City Hall. This facility was historically hailed as one of the largest Greyhound Bus Depots in the southeast and was in use until the late 2000s, where after Greyhound relocated and abandoned the original facility. Capstone purchased the building in 2018 with the intent to readapt the bus depot into Class A office space. The project is participating in the State and Federal Historic Tax Credit Program.
Williams Blackstock provided the programmatic planning and technical guidance to successfully readapt the Bus Depot into office space and meet the requirements of the Historic Tax Credit Program. WBA carefully studied the historic bus luggage area, waiting rooms, basement, and miscellaneous support spaces and developed a plan to sympathetically readapt the building into three separate office spaces, each with separate metering and dedicated building systems. Sight line studies were performed to thoughtfully locate roof top equipment to minimize visibility from the predominate streets.
Specified treatments for the rehabilitation of the historic plaster, cleaning of the exterior masonry and limestone, and the interior terrazzo refinishing were carefully provided. The iconic Streamline Moderne Greyhound marquee sign was completely rebuilt and the three-dimensional running dog was reconstructed and replaced above the entry. The aluminum windows are detailed to echo the historic design while also accommodating thermally broken fenestration systems that meet modern code.